National Commission for the Certification of Crane Operators (NCCCO) Lattice Boom Practice Test 2025 - Free NCCCO Crane Operator Practice Questions and Study Guide

Question: 1 / 400

Before lifting a load, what should a crane operator do regarding the load's securing?

Trust the rigger's judgment

Verify that it is secure and balanced

Before lifting a load, it is essential for a crane operator to verify that the load is secure and balanced. This ensures not only the safety of the operation but also the safety of personnel and equipment involved. A load that is not secured properly may shift or become unstable during the lift, leading to accidents or equipment failure.

By confirming that the load is both secure and balanced, the operator is taking proactive steps to ensure that the lift can be conducted safely and efficiently. This involves checking the rigging, slings, and any other securing mechanisms to ensure that they are correctly applied and that the load's center of gravity is properly aligned to prevent tipping.

Trusting the rigger’s judgment alone, waiting for supervisor approval, or relying solely on visual inspection do not provide the same level of assurance as actively verifying the load’s condition. While collaboration with riggers and supervisors is important, the crane operator has the final responsibility for conducting a thorough check before any lifting operation.

Get further explanation with Examzify DeepDiveBeta

Wait for the supervisor’s approval

Use a visual inspection only

Next Question

Report this question

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy